Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.12478548

- Product Categories
- Friendly Links
- home > Supply > Purification plant construction in Shandong Weifang Dongye Steel, 2014 Shandong purification plant construction
Purification plant construction in Shandong Weifang Dongye Steel, 2014 Shandong purification plant construction
Information Name: | Purification plant construction in Shandong Weifang Dongye Steel, 2014 Shandong purification plant construction |
Published: | 2014-06-07 |
Validity: | 0 |
Specifications: | Limitation |
Quantity: | |
Price Description: | |
Detailed Product Description: | Purification plant construction in Shandong Weifang Dongye Steel, 2014 Shandong Weifang purification plant construction is provided by Dongye Steel. Purification plant construction in Shandong Weifang Dongye Steel, 2014 Shandong Weifang Dongye purification plant construction Steel Engineering Co., Ltd. (www.sdjinquan.com) 2014 upgrade been newly introduced noise standards are generally more stringent than the cleanroom standards to protect the health of Shandong purification plant construction, the purpose is to protect the normal operation, meet the necessary contacts and conversations safe and comfortable working environment. So clean room key indicators to measure the noise is: 1. Since 2014 the effects of noise annoyance Shandong purification plant construction, people feel restless and troubled emotions generated, generally divided into a very quiet, very quiet, quieter, somewhat noisy, more noisy and very noisy seven annoyance levels. Where the level of response are very noisy and very noisy who is a high percentage of troubles, troubles high number is the total number of high annoyance rate. 2. Impact on the efficiency of this reaction mainly depends on the level of the three aspects of these three areas are: concentrate, movement accuracy, pace of work; 3. This integrated communications interference is mainly divided into: clear or satisfactory, slightly difficult, difficult purification plant construction project in Shandong, impossible. There is a problem in the humidifier should pay attention to the problem is the problem with the air conditioner air flowing water. Some engineering problems due to humidification did not deal with the latest water purification plant construction in Shandong, the results later in the efficiency filter or high efficiency filters are carrying water wet. For dry steam humidifier also pay attention to condense the steam pipe and pipe slope and aspect of the problem, to make the air conditioner condensate quickly discharged outside. If the humidifier fan section in the air conditioner, you should also take measures to avoid condensation of water droplets onto the motor, causing electrical short-circuit power. |
Admin>>>
You are the 14531 visitor
Copyright © GuangDong ICP No. 10089450, Weifang Dongye Steel Structure Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 14531 visitor
Copyright © GuangDong ICP No. 10089450, Weifang Dongye Steel Structure Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility